Completed |
Target Date |
Responsibility
|
|
|
(13 weeks before LS)
|
1. Are thoroughly
familiar with all phases of the operation as described in this manual (i.e.,
have read this manual thoroughly).
|
|
|
(13 weeks before LS)
|
2. Main meeting room(s)
or lecture hall(s) reserved for lecture series.
|
|
|
(12 weeks before LS)
|
3. Potential committee
heads of four main committees selected and invited to accept the
responsibilities.
|
|
|
(10 weeks before LS)
|
4. Four main committee
heads have agreed to accept their positions. |
|
|
(10 weeks before LS)
|
5. Have given
responsibility descriptions and related materials (as described in Section
B, 2g) in a binder cover to each committee head.
|
|
|
(10 weeks before LS)
|
6. Have gone over
these materials with each committee head.
|
|
|
(8 weeks before LS)
|
7. Have developed
Master Plan and Schedule for the entire operation.
|
|
|
(8 weeks before LS)
|
8. All committee heads
in place.
|
|
|
(8 weeks before LS)
|
9. Have imparted a
vision to the Christian students at a kick‑off meeting and are keeping this
before them.
|
|
|
|
10. Have reviewed
checklists with each committee head each week:
|
|
|
|
a.
Seven weeks before Rusty comes
|
|
|
|
b.
Six weeks
|
|
|
|
c.
Five weeks
|
|
|
|
d.
Four weeks
|
|
|
|
e.
Three weeks
|
|
|
|
f.
Two weeks
|
|
|
|
g.
One week
|
|
|
|
h.
The week of Rusty's lectures
|
|
|
|
i.
One week after Rusty leaves
|
|
|
|
11. Budget is set.
|
|
|
|
12. Fund‑raising plan
is in motion.
|
|
|
|
13. Maximum numbers of
students/volunteers are involved.
|
|
|
|
14. Classes are being
lined up.
|
|
|
|
15. Publicity
Coordinator is informed that university president and other dignitaries are
to be invited personally.
|
|
|
|
1.
President and dignitaries have been invited.
|
|
|
|
17. Hotel
accommodations for Rusty are secure.
|
|
|
|
18. Driver is lined
up.
|
|
|
|
19. Schedule is
complete.
|
|
|
|
20.
You have reread all your material one week prior to Rusty's coming.
|
|
|
|
21. Information folder
with contents is ready.
|
|
|
|
22. The Lecture Series
is in progress!
|
|
|
|
23. Bills are paid.
|
|
|
|
24. Thank‑you notes
have been sent to appropriate people who provided help.
|
|
|
|
25. Evaluations and
reports are collected from committee heads after Rusty leaves.
|
|
|
|
26. Your summary
evaluation/report is submitted to your director.
|
|
|
|
27. Reports and other
materials are included in local ministry files for future use.
|